成人黄色一级黄色片_手机黄丨片免费看_综合欧美日韩国产成人高清_菠萝菠萝蜜在线_狠狠狠色丁香婷婷综合久久五月_老熟女毛茸茸浓毛_欧日韩精品一区二区三区_国产熟女精品视频国语_香蕉视频美日韩_免费AV 中文字幕 在线

020-34901288




Glass products waterborne paint

Glass products waterborne paint

Product description: Safety, health, non-pollution, low carbon and non-toxic Main components: Waterborne acrylic resin, amino resin, waterborne epoxy resin, waterborne environmental pigments, water-borne additives Applicable products: Glass products protection and decoration Accessory products: High temperature lacquer for SX-AHB series of acrylic glass(Cosmetic bottle series) Lacquer for SX-AMB series of acrylic glass(wine bottle series) Lacquer for SX-BL series self-dried acrylic glass(decorative glass series)




Glass products waterborne paint





Product description: Safety, health, non-pollution, low carbon and non-toxic
Main components: Waterborne acrylic resin, amino resin, waterborne epoxy resin, waterborne environmental pigments, water-borne additives
Applicable products: Glass products protection and decoration
Accessory products:
High temperature lacquer for SX-AHB series of acrylic glass(Cosmetic bottle series)
Lacquer for SX-AMB series of acrylic glass(wine bottle series)
Lacquer for SX-BL series self-dried acrylic glass(decorative glass series)


(Guidance of construction technology)

Construction conditions: The construction temperature is above 5 centigrade, and the air humidity must be less than 80%.
Base material treatment: The surface of glass or ceramic needs to be washed and cleaned with the treatment agent. If needs to spray thickness of the higher dry film (> 30 mu m) at one time during the assembly line, suggest workpiece should be preheated (35-50℃), to avoid sagging uneven.
Construction viscosity:Use pure water to adjust the viscosity and add 10%-30% according to the weight of water lacquer. The specific amount of addition depends on the construction effect; General adopt spraying, also rolling, dip coating, must be confirmed in advance of the customers technical conditions, in order to provide the appropriate products.
Drying condition: A series of water-based lacquer products must be baked at 160-190℃ by 15-30min by the drying road, can be packed after cooling. The self-dry paint series can be dried at normal temperature and can also be baked at low temperature to save the time. It is suggested that 60-80 ℃ * 20-30mins.


Performance index:


Test project

Test method

Test standard

Aging test

QUV-A tested for 48hours

No obvious discoloration and yellowing

Cross-cut test

Draw the grid with cross-cut on the test bottle, and sticked on the pane with 3M tape, pressed on the tape for about 1 minutes with your thumb, quickly uncover the tape with the 45-90 degree direction of the test surface.

≥4B, there is no lacquer shedding in the line area

Water resistance test

Put the test bottle and the bottle with cross-cut line into the 40℃ water bath  for 50mins, and test them with cross-cut method individually.

Paint film does not fall off,no decolorizing

Wear resistance test

Cooling the test bottle to room temperature, wrapping the grid paper flat on the table, the bottle closes to the grille paper, and  pushing the bottle back and forth on the grille paper 20 times with your hand.

No obvious decolorizing,shedding and scratching

Color appearance

Put the test bottle and sample on the white paper, compare with the sample in multi angle visual.

The surface is smooth, no pinholes, particles orange peel,bubbles and other defects,  no obvious color difference to the standard sample.

Simulated transport test

Put the test bottle in the grilles packing box , seal it well, then put it in an analog   transport vibrator wear-resistant instrument,reinforce, adjust the equipment 160 rotation /30mins vibration.

No obvious scratch,or loss of lustre.



1.Before spraying, it is necessary to check whether the spray gun is clean, and whether the air compressor is normal to remove the oil and water.
2.The painting room should be clean and tidy, no dust, ash and so on.
3.The packing bucket should be sealed and the label is cleared to prevent the use of the wrong material.
4.Painting room ambient temperature should be controlled above 10 degree, the optimal range of 20-30 degrees, humidity should be controlled below 80%, the optimal range of 60-70%.
5.It is suggested that the water-based paint should be filtered by200 mesh silk cloth  after diluted, and then sprayed.
6.During construction, the surface of the coated material should be kept clean, no dust and oil pollution and so on.
7.The use period of the waterborne double component is 3h, and it is recommended to use it within 3 hours after the curing agent is added.


Quality guarantee period:The expiry date of the coating is half a year. Be sure to use it in the period of validity so as not to affect the quality of the coating。
Storage conditions: The product should be sealed and stored in the environment of
0℃-40℃.






Hot products






Glass products waterborne paint

Glass products waterborne paint

Product description: Safety, health, non-pollution, low carbon and non-toxic Main components: Waterborne acrylic resin, amino resin, waterborne epoxy resin, waterborne environmental pigments, water-borne additives Applicable products: Glass products protection and decoration Accessory products: High temperature lacquer for SX-AHB series of acrylic glass(Cosmetic bottle series) Lacquer for SX-AMB series of acrylic glass(wine bottle series) Lacquer for SX-BL series self-dried acrylic glass(decorative glass series)

Glass products waterborne paint





Product description: Safety, health, non-pollution, low carbon and non-toxic
Main components: Waterborne acrylic resin, amino resin, waterborne epoxy resin, waterborne environmental pigments, water-borne additives
Applicable products: Glass products protection and decoration
Accessory products:
High temperature lacquer for SX-AHB series of acrylic glass(Cosmetic bottle series)
Lacquer for SX-AMB series of acrylic glass(wine bottle series)
Lacquer for SX-BL series self-dried acrylic glass(decorative glass series)


(Guidance of construction technology)

Construction conditions: The construction temperature is above 5 centigrade, and the air humidity must be less than 80%.
Base material treatment: The surface of glass or ceramic needs to be washed and cleaned with the treatment agent. If needs to spray thickness of the higher dry film (> 30 mu m) at one time during the assembly line, suggest workpiece should be preheated (35-50℃), to avoid sagging uneven.
Construction viscosity:Use pure water to adjust the viscosity and add 10%-30% according to the weight of water lacquer. The specific amount of addition depends on the construction effect; General adopt spraying, also rolling, dip coating, must be confirmed in advance of the customers technical conditions, in order to provide the appropriate products.
Drying condition: A series of water-based lacquer products must be baked at 160-190℃ by 15-30min by the drying road, can be packed after cooling. The self-dry paint series can be dried at normal temperature and can also be baked at low temperature to save the time. It is suggested that 60-80 ℃ * 20-30mins.


Performance index:


Test project

Test method

Test standard

Aging test

QUV-A tested for 48hours

No obvious discoloration and yellowing

Cross-cut test

Draw the grid with cross-cut on the test bottle, and sticked on the pane with 3M tape, pressed on the tape for about 1 minutes with your thumb, quickly uncover the tape with the 45-90 degree direction of the test surface.

≥4B, there is no lacquer shedding in the line area

Water resistance test

Put the test bottle and the bottle with cross-cut line into the 40℃ water bath  for 50mins, and test them with cross-cut method individually.

Paint film does not fall off,no decolorizing

Wear resistance test

Cooling the test bottle to room temperature, wrapping the grid paper flat on the table, the bottle closes to the grille paper, and  pushing the bottle back and forth on the grille paper 20 times with your hand.

No obvious decolorizing,shedding and scratching

Color appearance

Put the test bottle and sample on the white paper, compare with the sample in multi angle visual.

The surface is smooth, no pinholes, particles orange peel,bubbles and other defects,  no obvious color difference to the standard sample.

Simulated transport test

Put the test bottle in the grilles packing box , seal it well, then put it in an analog   transport vibrator wear-resistant instrument,reinforce, adjust the equipment 160 rotation /30mins vibration.

No obvious scratch,or loss of lustre.



1.Before spraying, it is necessary to check whether the spray gun is clean, and whether the air compressor is normal to remove the oil and water.
2.The painting room should be clean and tidy, no dust, ash and so on.
3.The packing bucket should be sealed and the label is cleared to prevent the use of the wrong material.
4.Painting room ambient temperature should be controlled above 10 degree, the optimal range of 20-30 degrees, humidity should be controlled below 80%, the optimal range of 60-70%.
5.It is suggested that the water-based paint should be filtered by200 mesh silk cloth  after diluted, and then sprayed.
6.During construction, the surface of the coated material should be kept clean, no dust and oil pollution and so on.
7.The use period of the waterborne double component is 3h, and it is recommended to use it within 3 hours after the curing agent is added.


Quality guarantee period:The expiry date of the coating is half a year. Be sure to use it in the period of validity so as not to affect the quality of the coating。
Storage conditions: The product should be sealed and stored in the environment of
0℃-40℃.